Main URL: Teran

View Our Work - Interior

During: Church. Work areas covered with plastic and dropclothes. Preparation in progress.

After: Church.


After: Foyer. Removed old wallpaper, cleaned walls, primed for new wallpaper; prepared and painted all other surfaces.

After: Foyer.


After: Kitchen. Prepared and painted all surfaces.

After: Office.


After: Living Room. Prepared and painted all surfaces.

After: Bar. Prepared and painted all surfaces.


After: Dining room. Prepared and painted all surfaces.

After: Bedroom. Prepared and painted all surfaces.


After: Bedroom. Prepared and painted all surfaces.

After: Bedroom. Prepared and painted all surfaces.


After: Bathroom. Prepared and painted all surfaces.

After: Bathroom. Prepared and painted all surfaces.


Before: Den.

After: Removed border, repaired areas, sanded, primed, painted.


Before: Bathroom with wallpaper.

After: Removed wallpaper, cleaned walls of glue, repaired areas, sanded, primed, painted.


Before: Exposed ceiling due to water damage.

After: installed drywall; applied plaster, tape, compound; sanded; primed; painted.


After: Sanded, primed and painted kitchen cabinets.

After: Sanded, primed and painted kitchen cabinets; painted ceiling.


After: Sanded, primed and painted kitchen cabinets; painted walls.

After: Sanded, primed and painted kitchen cabinets; painted ceiling and walls.


Wall Paper Removal: Walls are scraped to remove wall paper and washed to remove glue. Surface is then prepared for painting or more wall paper by repairing holes, sanding until surface is smooth, and applying primer.


Doctor Reception Area, After: Moved items, sanded, caulked, painted and returned items to original location.

Examination Room, After: Moved items, sanded, caulked, painted and returned items to original location.


Room, before: Room with new sheetrock / dry wall.

Room, after: Sanded, caulked, primed and painted room.


Before: White walls.
The banister and stairs are protected with drop cloths. The stairwell entry is blocked with plastic to minimize sanding dust going into other rooms.

After: applied compound, sanded, primed and painted.



Before: applied dry wall, tape, compound, sanding.

After: primed and painted walls, trim and ceiling.



Before: Hanging ceiling, panels on walls, no trim.

After: removed hanging ceiling, removed paneling, plastered, caulked, sanded, installed trim, primed and painted: walls, trim, ceiling, radiator cover.


Bathroom, before: New sheetrock / dry wall.

Bathroom, after: caulked, sanded, primed and painted.



Before: Mural on wall.

After: Removed mural.


Basement, before: Dark paneling.

Basement, after: Sanded, caulked, primed and painted paneling.


Dining room, after: Prepared and painted.

Basement, after: Prepared and painted.

 

Web site designed & developed by: Teran