help@TeranServices.com
Main URL: Teran

Services


Teran Services, Inc. - Painting Services:


  • Interior & Exterior Painting

  • Application of: Paint, Stain, Varnish, Sealant, Polyurethane

  • Preparation and painting of: Walls, Doors, Windows, Trim, Ceilings, Banisters, Stairs, Furniture (indoor & outdoor; Metal/Wrought Iron), Kitchen cabinets, Garage doors, Fences, Railings, Sheds, Basements and Porches

  • Preparation and painting of surfaces including: Wood, Concrete, Metal, Wrought Iron, Drywall/Sheet Rock, Stucco, Shingles, Aluminum siding, Metal siding

  • Removal of: Old Layers of Paint, Wallpaper, Wall Paneling, Murals

  • Wall preparation for wallpaper

  • Reparation of: Cracked walls, Water Damage, sheet rock / drywall

  • During Preparation - Application of: primer, skim coat, glaze, putty, caulk, compound, plaster, tape, drywall/sheet rock

  • Basement dampness removed with the application of UGL Products

  • Power washing: houses, decks, patios, walkways, walls

  • Minor carpentry

  • Minor masonry

  • Gutter Cleaning

Teran Services, Inc. - Property Types Serviced:


  • House

  • Doctor's Office

  • Commercial business


Typical Steps:

Teran Services, Inc. will treat your home the way we treat ours. The following are the typical steps we follow when working on a painting project (Steps may vary based on project - details provided during our meeting):
  1. Move items out of the direct path of the painting project area.
  2. Protect non painting project areas with drop cloths and plastic. Furniture is covered with plastic first and then drop cloths. Doorways leading to other rooms are sealed with plastic to minimize dust travel.
  3. Tighten loose screws and hammer loose nails as needed.
  4. Remove hardware from walls to ensure thorough paint application.
  5. Scrape and sand surfaces by appropriate method (machine, hand, wire brush) to eliminate dirt, peeling paint and old layers of paint to maximize the final result.
  6. Caulk, compound, tape, putty and plaster surfaces as needed.
  7. Prime bare wood, bare metal, stained surfaces and surfaces changing color to ensure proper paint adhesion.
  8. Paint is applied in two coats unless the customer requests that one coat be applied.
  9. The job site is cleaned of all materials, debris and tools at the end of each workday. Work dust is vacuumed daily.
  10. Discuss progress daily and ask/answer questions as required.